Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Adami, V S, Verschoore, J R and Antunes Junior, J A V (2019) Effect of Relational Characteristics on Management of Wind Farm Interorganizational Construction Projects. Journal of Construction Engineering and Management, 145(03).

Alruqi, W M and Hallowell, M R (2019) Critical Success Factors for Construction Safety: Review and Meta-Analysis of Safety Leading Indicators. Journal of Construction Engineering and Management, 145(03).

Chegu Badrinath, A and Hsieh, S (2019) Empirical Approach to Identify Operational Critical Success Factors for BIM Projects. Journal of Construction Engineering and Management, 145(03).

Kim, T and Chi, S (2019) Accident Case Retrieval and Analyses: Using Natural Language Processing in the Construction Industry. Journal of Construction Engineering and Management, 145(03).

Laurent, J and Leicht, R M (2019) Practices for Designing Cross-Functional Teams for Integrated Project Delivery. Journal of Construction Engineering and Management, 145(03).

Lindhard, S M, Hamzeh, F, Gonzalez, V A, Wandahl, S and Ussing, L F (2019) Impact of Activity Sequencing on Reducing Variability. Journal of Construction Engineering and Management, 145(03).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001618
  • Abstract:
    Variation in production is a major cause of producing waste in onsite construction operations, resulting in a workflow that is full of delays and interruptions. To reduce the negative impact of waste in construction, production managers need to address the causes of the variation that results in such waste. This paper explains the way to reduce the effects of variation in construction by changing the task sequence arrangement. The study analyzed the effect of some different task sequence arrangements on the production gap, crew waiting time, and production delay by simulating a group of work tasks and changing the task sequence arrangement from linear to parallel. Accordingly, 100 work activities were simulated in 98 different sequence designs, using a stochastic discrete-event simulation model, during which the number of parallel activities was systematically increased. The main finding from the studied configuration is that arranging tasks in parallel increases waste, whereas it reduces project duration. Moreover, waste resulting from variation was found to be an additional cause of waste when accelerating the production. Finally, it was revealed that the impact of variation on the task sequence highly depends on how often the schedule is updated. This study helps production managers to better understand of how the task sequence arrangement affects production performance in onsite construction operations.

Monzer, N, Fayek, A R, Lourenzutti, R and Siraj, N B (2019) Aggregation-Based Framework for Construction Risk Assessment with Heterogeneous Groups of Experts. Journal of Construction Engineering and Management, 145(03).

Nguyen, L H (2019) Relationships between Critical Factors Related to Team Behaviors and Client Satisfaction in Construction Project Organizations. Journal of Construction Engineering and Management, 145(03).

Su, Z, Wei, H, Zou, X and Qi, J (2019) Zero-One Formulation for a Partial Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Journal of Construction Engineering and Management, 145(03).

Wang, Q, Guo, Z, Mintah, K, Li, Q, Mei, T and Li, P (2019) Cell-Based Transport Path Obstruction Detection Approach for 4D BIM Construction Planning. Journal of Construction Engineering and Management, 145(03).

Zhang, H, Yan, X, Li, H, Jin, R and Fu, H (2019) Real-Time Alarming, Monitoring, and Locating for Non-Hard-Hat Use in Construction. Journal of Construction Engineering and Management, 145(03).